Now the grounding side. Grounds that deteriorate over time are a challenge for all okder vehicles and ours are no exception. To ensure a good ground so that full voltage will be seen by the various electical units, a new ground post was added by drilling into the top of the frame, tapping it and then screwing in a stud (it will be welded to the frame later). I then attached another 12 guage line to the stud and ran that lead inside the coach to an accessible location.
|