Search | Statistics | User Listing | Member Roster | Coach DB Forums | Albums
FMC Owner's Forum
Home -> FMC Owner's Forum

You are logged in as a guest. ( logon | register )

#846 - Cummins Swap
Return to the album thumbnailsBack Next




Here ya' go Lenny! I actually took your advise and did a mock-up out of some crap plywood I had kicking around. Used a laser under the coach to spec out the sketch to make sure all clearances were considered and accounted for. The primary material will be 3 1/2" X 5" X 5/16" angle iron. Most of the 3-ft. main-beam section and the 12" long mount section that will be welded to the trailing arm will be made from this; additionally, this mount will be bored for three 1/2" bolts so the main beam can be bolted to it and easily removed if required. So far it's looking good but I've yet to confirm the correct angle to mount/weld the mounting plate at.


Go to FMCowners.com HomeRunning MegaBBS ASP Forum Software
© 2002-2024 PD9 Software
(Delete all cookies set by this site)