| ||
|
You are logged in as a guest. ( logon | register ) |
Continuing Renovations to #1027 | ||
Author: TravalonSF (Show all albums) |
| |||||
Green stripe painted. | Extensive use of my photographs and measurements to get the curves right. | Cream colored applied and stripes taping being attempted with a lot of cussing going on!!! | Catalyzed non-sand sealer/prime applied. | ||
Sanding, Sanding and more Sanding! | Jim repaired the front spoiler which had lots of small cracks and imperfections. | All stripes were carefully sanded through just to the gel coat and skin repaired where needed. | Awning attachment repairs ground out and completed properly. | ||
An aluminum plate laid up with wet fiberglass on both side was slipped in behind the cracks. | Cracks on both sides were ground down for fiberglass repair. | The coach was modified by RVS years ago to offer a side mounded awning including lowering the door height. Totally awful execution!!! | False wall not completed yet to the ceiling. | ||
|
Running MegaBBS ASP Forum Software © 2002-2024 PD9 Software | (Delete all cookies set by this site) | |