| ||
|
You are logged in as a guest. ( logon | register ) |
Brake Job and Redesign | ||
Author: LCAC_Man (Show all albums) standard brake job plus the addition of electric powered hydroboost system for the rear brakes |
| |||||
starting with the rear passenger side as it has the leaky lower wheel cylinder, upper cylinder appears to be much newer | back plate bolt patter is 6 on 6", center hole diameter is 5" | spindle lengths: rear seal shoulder(RSS) to axle end- 8 1/8" RSS to spindle end- 6 1/8" RSS to outer bearing shoulder 3 7/8" | rear seal land width 7/8" inner to outer bearing center to center width 4 1/8" total spindle/axle to backside of backplate length 11 3/4" | ||
axle shaft diameter 1.5" axle spline count 34 inner bearing spindle dia. 2.623" outer bearing spindle dia. 2.250" | rear lug and stud adapter set up for alcoas | drum was actually in great shape, I could have just had it turned (appears to have never been turned before) as it has no heavy gouging. Drum outer diameter widest 16 3/8" | just a quick turn to knock off the glaze is all that would be needed | ||
(2 Comments) lug tools that came with my coach when I bought it, they seam very specific to this application | p/n 32501 for the wrench and 32318 for the handle, about $60 total on amazon | contains square drive for the stud adapter | standard lug nut size on this end | ||
|
Running MegaBBS ASP Forum Software © 2002-2024 PD9 Software | (Delete all cookies set by this site) | |