 
  As part of the scooter lift I swapped in a 7 blade plug to carry a bit more power than the existing 6 pin. |  
  Single receiver set up now, will become a 3 receiver configuration when I'm done with it. |  
  (4 Comments) This shows the open structure that connects the two frame rails. This entire structure will be "boxed" top and bottom, and the attachment to the frame rails will be improved. |  
  Receiver as it currently is, I inset it to the existing structure. |